Resin and Photo Etch Kits

Detailed N & OO model kits and accessories designed for added realism on your layout


Shopping cart  Shopping cart
0 Product(s) in cart
Total £0.00
» Checkout



Our Layout

Welcome to the first of many updates about the ongoing restoration of our layout.

Image

Update - November 2012

Over the past six months as time has allowed I have removed all the old track work, laid new cork trackbed, laid around 50 meters of track and point work, wired most of the sections (every length of track has its own feed) ready to use the Gaugemaster DCC system.

New track

I still have the industrial area in the central location to lay and wire, along with the country branch line and its small terminus station and goods yard.  I estimate we are still have to lay a further 25 meters or so of track and point work, and connect all the track feeds up.

New track

Once electrical testing is completed I will be able to run some test trains using old locomotives and wagons before I start the ballasting and point motor installation work.

Track Bus

I will bring you some more soon, but for now its time to finish a number of new masters ready for production.